| Sub-problem 1b - Page 4 of 7 | ID# C401B04 | 
      
      
     
    Sub-problem 1b: Analysis of 
    the Eastbound Freeway Section
    
    
    Using 
    the method to calculate FFS based on BFFS as shown in Chapter 23, our FFS is projected to be 
    55.5 mph, which is very close to what the data shows us in
    Exhibit 4-8.
    
    
    Now we need to revisit
    Exhibit 4-11 and see that the next thing to do is to 
    calculate the peak 15-minute flow rate. 
    
    [
    Back ] [ Continue ] 
    with 
    Sub-problem 1b