Home
> Problem 4 >
Sub-problem 4c: Clifton Country Road 2004 PM - With vs. Without ConditionsIt’s in the comparison of the with versus without conditions for the future design year, the traffic impact assessment finds its main emphasis. What network enhancements are required to accommodate the without conditions? Nominally, those improvements are the responsibility of the owning and operating agency. The differences between the without and the with condition are traceable to the development. At
the Clifton Country Road intersection, we can look at this without
versus with comparison in the context of the PM peak, one of the
major times when the impacts occur. Exhibit 2-45 presents the intersecting
volumes for three conditions: the Year 2004 volumes without the site (2004
PM without); the percentage distribution of outgoing traffic (eastbound) and
incoming traffic (westbound through, northbound left, southbound right);
the site-generated traffic (vehicles per hour); the year 2004 with
conditions; and the year 2004 with conditions with 30% more site-generated
traffic. We will use each of the three intersecting volume
conditions in our analysis.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||