Home
> Problem 4 >
Sub-problem 4b: Clifton Country Road PM peak hour - Existing ConditionsWe could examine many issues based on the PM Existing conditions. A few are lane utilization, coordination, lane groups, lost time, critical movements, signal timing, and queue length. Of these, we haven’t examined lost time or right turns on red. We will use the PM Existing condition to look at these two issues as well as the difference between demand and volume.Analyses: |