Home
> Problem 5 >
Sub-problem 5b - Page 4 of 7 Sub-problem 5b:
Three-phase
Traffic Signal Control with a Protected Westbound Left Turn
This analysis was repeated
with two modifications. First, the inter-green times were increased from 4
sec to 6 sec. Second, the green times were redistributed by trial and error
to produce a closer agreement between the v/c ratios for the critical
movements. The results are shown in the next column of Exhibit 3-39. The
following observations are offered:
-
The critical v/c ratio for the whole
intersection was increased from 0.79 to 0.83 as a result of increasing the
inter-green times and thereby reducing the effective green times.
-
The increase in v/c ratios was,
predictably, accompanied by an increase in delay; but the delay increase
was not sufficient to change the level of service for any of the
movements.
-
The critical v/c ratios for each phase
are in closer agreement (0.83, 0.83 and 0.84). This was the closest
possible agreement that could be produced by trial and error with 0.1 sec
resolution in the green times.
-
The control delays and levels of
service differ widely among the various movements. This observation makes
it clear that equalizing the v/c ratios does not necessarily equalize the
delays among competing movements. Note that the delays varied from 18 sec
per vehicle to 96 sec per vehicle and the LOS varied from B to F.
[
Back ] [ Continue ] with
Sub-Problem 5b |