| Home
> Problem 2 >
Sub-problem 2d - Page 5 of 7 Sub-problem 2d: How
Can We Improve the Level of Service at the Ramp Junction at the Northbound On-Ramp to
I-87?
The table below shows the effect
of adding a lane to the ramp so that two lanes are maintained on the ramp
for its entire length from Alternate Route 7 to I-87 North.
| Freeway data |
PM Peak
(Before) |
PM Peak
(After) |
| Number of lanes, N |
3 |
3 |
| Free flow speed, SFF |
55 |
55 |
| Volume |
4,800 |
4,800 |
| Ramp data |
PM Peak
(Before) |
PM Peak
(After) |
| Ramp volume |
1,900 |
1,900 |
| Number of lanes on-ramp, N |
1 |
2 |
| Length of acceleration lane, LA |
500 |
500 |
| |
| Output data |
PM Peak
(Before) |
PM Peak
(After) |
| PFM |
0.59 |
0.56 |
| V12, pc/h |
3,154 |
2,960 |
| VFO actual |
7,444 |
7,444 |
| VFO maximum |
6,750 |
6,750 |
| VR12 actual |
5,265 |
5,071 |
| VR12 maximum |
4,600 |
4,600 |
| Density, pc/mi/lane |
42.5 |
34.7 |
| LOS for ramp-freeway junction area of
influence |
F |
F |
| Speed-ramp influence area, mph |
41.6 |
44.5 |
| Speed-outer lanes, mph |
49.0 |
48.0 |
| Speed-all vehicles, mph |
43.5 |
45.6 |
After reviewing the output data
shown in the table above, consider the following questions:
Discussion:
Take a few minutes to consider
these questions. When you are ready, continue to the next page.
[
Back
] [
Continue ] with Sub-Problem 2d |