|
| Table
3. Maxwell Drive PM peak - Existing Conditions, Base Case Results |
|
EB Arrival Type |
Heavy Vehicles |
Phase Skip |
Signal Timing |
Metric |
EB |
WB |
SB |
OA |
|
L |
T |
R |
Total |
L |
T |
R |
Total |
L |
T |
R |
Total |
|
2 |
Yes |
Yes |
Base |
Delay |
18.2 |
5.3 |
- |
7.7 |
- |
13.7 |
16.7 |
17.3 |
- |
20.8 |
18.5 |
13.7 |
|
Queue |
1.8 |
4.2 |
- |
- |
- |
9.9 |
- |
2.4 |
- |
2.7 |
- |
- |
|