    Sub-problem 3d: 
    Collector/Distributor Road
    
    Discussion
    So what lessons have we learned from the analysis? First, we encountered 
    another situation where the highway geometrics are non-standard from the 
    perspective of the HCM; so we need to determine how the situation should be 
    analyzed. Second, a weaving analysis is possible and appropriate between the 
    loop ramps, provided more-than-normal care is taken in examining and 
    interpreting the results of the analysis. Third, the computed number of 
    lanes required for an unconstrained weave needs to be compared with the 
    number of lanes available, realizing that the non-weaving movements are 
    effectively zero. This means that if the weaving movements are acceptable, 
    the entire weaving section is also acceptable.
    [ 