|
|
|
Exhibit 1-53. Quick Estimation Summary: U.S. 95 at Sweet Avenue |
||||||
| Direction | East-West | North-South | ||||
| Phase | 1 | 2 | 3 | 1 | 2 | 3 |
| Movements | EBWBTH | NBTHLT | NBSBTH | |||
| Critical Volume | 416 | 160 | 500 | |||
| Computed cycle length in the specified range of 60-120 sec | 60 | |||||
| Total entering vehicles | 1,076 | |||||
| Critical v/c ratio based on the selected cycle length | 0.79 | |||||
| Status: "Under Capacity" | ||||||