Performance Estimation:

Having synthesized a complete phasing and timing plan using the quick estimation method, we are now in a position to estimate the performance measures, including the level of service using the operational analysis procedure given in Chapter 16 of the HCM 2000. The performance evaluation, with all of its precision, would have little or no significance to this 20-year projection into the future.